MisPrint3D
MisPrint3D

3D printing, layer by layer

Sunday, 22 November 2026
Home>Business>Snowbird Technologies Reports Cost and Lead Time I…
Business

Snowbird Technologies Reports Cost and Lead Time Insights from RIMPAC 2026

·2 min read

Written with artificial intelligence.

Snowbird Technologies Reports Cost and Lead Time Insights from RIMPAC 2026

Snowbird Technologies has shared results from RIMPAC 2026, showcasing its SAMM Tech hybrid manufacturing platform's ability to produce metal parts aboard the USS Essex and at Schofield Barracks. The findings indicate significant cost savings and reduced procurement delays, highlighting the potential of on-demand manufacturing in military operations.

Overview of RIMPAC 2026 Participation

Snowbird Technologies, a manufacturer specializing in deployable manufacturing systems, has released findings from its involvement in RIMPAC 2026. Utilizing its SAMM Tech hybrid manufacturing platform, the company produced metal replacement parts on the USS Essex and at Schofield Barracks in Hawaii. This initiative was part of the Naval Postgraduate School’s Consortium for Advanced Manufacturing Research and Education (CAMRE) and FLEETWERX projects.

Cost Savings and Production Efficiency

During the exercise, Snowbird reported that four of the seven components manufactured were less expensive to produce than to procure. The SAMM Tech platform, which integrates the Meltio Engine Blue for metal additive manufacturing, utilized metal wire as feedstock and nitrogen as the process gas.

The components manufactured included:

  • Oxygen tank brackets: 12 units produced in 75 hours at a cost of $2,492, compared to $9,624 from Pearl Harbor Naval Shipyard.
  • Outer load test clamp: Manufactured in 3 hours at a cost of $101, versus $420 to procure.
  • Inner load test clamp: Took 9 hours to print for $289, compared to $420 procurement costs.
  • Air pressure radio six-pack: Completed in 5 hours for $154, against $624 procurement costs.

Procurement Time Reduction

Though one component, the turnbuckle outer, was more costly to produce locally at $902 compared to a procurement cost of $590, Snowbird emphasized the avoidance of 692 hours in procurement time. This suggests that on-demand manufacturing can be justified even when costs are higher, especially in urgent situations.

Karl Wojtkun from Snowbird noted the importance of demonstrating manufacturing capabilities in operational environments, confirming that local production can significantly reduce delays in supply chains. The SAMM Tech system also successfully transitioned from shipboard to land-based operations, showcasing its versatility.

Future Goals

Looking ahead, Snowbird aims to develop a comprehensive distributed manufacturing workflow that integrates digital part files, production, inspection, and sustainment capabilities. The results from RIMPAC 2026 underline the potential of expeditionary manufacturing to enhance military readiness by enabling rapid production of necessary components without traditional procurement limitations.

BusinessMetal 3d printingMilitary innovationManufacturing costsExpeditionary manufacturingSupply chain efficiency
← Back to homepage